May 2026 landlord action plan: 10 things to do before 1 May

The Renters' Rights Act Phase 1 commences on 1 May 2026. This is your 10-point action plan: what to do, in what order, before the biggest change to UK private renting in 40 years.

10 min readUpdated 25 April 2026Last reviewed: 17 May 2026Renters' Rights ActComplianceAction planMay 2026

The Renters' Rights Act 2025 Phase 1 commences on 1 May 2026. Every private landlord in England needs to act before that date. This guide gives you a clear, ordered checklist, from reviewing your existing tenancies to serving the mandatory Information Sheet. Miss the deadline and you lose rights; get it right and you are protected.

Deadline: 1 May 2026

On 1 May 2026, Section 21 is abolished, every AST converts to an Assured Periodic Tenancy, and new rules apply to rent increases, pet requests and possession. Most of these actions apply to your existing tenancies, not just new ones. Act now.

1. List every tenancy you are a party to

Start with a complete inventory. Every property you let in England under an Assured Shorthold Tenancy is within scope. Note the property address, the tenant names, the tenancy start date, and whether you have a fixed-term or periodic AST. This list is the foundation for everything else.

2. Destroy or archive any unused Section 21 forms

Section 21 notices are permanently abolished on 1 May 2026. Any template you have, whether a solicitor's form, an agent's form, or a downloaded template, is legally dead from that date. Archive them with a clear label ('pre-commencement only') or delete them to avoid accidentally using one.

3. Download the updated Section 8 pack

The Section 8 notice form has been revised under the Renters' Rights Act. Using an old Form 3 after 1 May 2026 is a procedural defect that can invalidate your possession claim. LetSafe UK's Section 8 Notice Pack (LS-E-010, �19) includes the revised form, a ground-selection matrix, and a notice period table for each ground.

4. Get your new tenancy agreement ready

From 1 May 2026, you cannot grant a new fixed-term AST. All new private tenancies in England must be Assured Periodic Tenancies (APTs). LetSafe UK's Periodic Assured Tenancy Agreement (LS-E-001, �29) is drafted for the post-commencement regime and includes the new pet-request clause, the bidding-ban acknowledgement, and the revised grounds schedule.

5. Serve the mandatory Information Sheet (by 31 May 2026)

All landlords must serve a government-prescribed Information Sheet on every existing tenant by 31 May 2026. Failure to serve it is a civil offence with a penalty of up to �7,000. The Information Sheet must be served to each named tenant individually, not just one copy per household.

  • Download the official PDF from GOV.UK
  • Email a copy as an attachment to each named tenant (a link is not sufficient)
  • Or print and post/deliver a copy to each named tenant
  • Keep proof of service for each tenant

6. Review your rent-increase process

From 1 May 2026, rent can only be increased using Section 13. Any contractual rent-review clause in your existing tenancy is overridden. You must serve a prescribed Section 13 notice, wait the notice period, and the tenant can refer the new rent to the First-tier Tribunal if they dispute it. You can only increase rent once every 12 months.

7. Update your pet-request process

From 1 May 2026, a tenant has a statutory right to make a written pet request. You must respond in writing within 42 days. You can only refuse on reasonable grounds. Silence or a blanket refusal without reasons is a civil offence.

8. Audit your deposit protection

Every deposit must be protected in an approved scheme within 30 days of receipt, and Prescribed Information must be served within the same 30-day window. A non-compliant deposit regime can bar you from relying on certain Section 8 grounds.

9. Confirm your compliance certificates are current

  • Gas Safety Certificate, renewed annually; every tenant receives a copy within 28 days of the annual check
  • EICR, renewed every five years; served before move-in
  • EPC, must be valid and minimum E rating for new lets
  • Smoke and CO alarms, working smoke alarm on every floor, CO alarm in every room with a solid fuel appliance
  • Renters' Rights Act Information Sheet, must be served on all new tenants from 1 May 2026 (the old How to Rent guide was withdrawn in June 2026)

10. Get the Transition Pack

LetSafe UK's Renters' Rights Act Transition Pack (LS-E-130, �39) bundles the key documents for existing landlords: the revised Section 8 form, the Periodic Assured Tenancy Agreement, the Section 13 Rent Increase Pack, and a covering letter to accompany the Information Sheet.

Quick summary

List tenancies ? destroy old S21 forms ? get updated S8 pack ? get PAT agreement ? serve Information Sheet by 31 May ? update rent-review process ? set up pet-request process ? audit deposits ? check compliance certs ? get the Transition Pack.

Templates recommended in this guide

Put this guide into practice, get the Renters' Rights Act Transition Pack from the LetSafe shop, the regulation-current pack that matches this guide.

TransitionLS-E-130

Renters' Rights Act Transition Pack

For landlords who need to migrate existing ASTs onto the new regime. The single most-searched landlord product of 2026.

£39
Live now
TenancyLS-E-001

Periodic Assured Tenancy Agreement

The new default English tenancy from 1 May 2026. Periodic from day one, with the prescribed written statement of terms built in. Ships with the Form 4A rent-increase notice template and an Information Sheet delivery acknowledgement form so a buying landlord has every Phase-1 compliance document in one pack.

£29
Live now
NoticeLS-E-010

Section 8 Notice Pack (All Grounds)

Every mandatory and discretionary ground on the new 2026 list, pre-labelled with the notice period, arrears threshold, and evidence block.

£19
Live now
ComplianceLS-E-020

Landlord Annual Compliance Checklist

Annual walk-through of every compliance touchpoint: gas, electrical, EPC, smoke/CO, Right-to-Rent, deposit, licensing, database registration.

£19
Live now

Found a gap or disagree with something?

Reply to any LetSafe email or write to Richard@letsafeuk.co.uk. We rewrite guides when we get something wrong, the sooner we hear, the sooner we fix it.

Hand-picked by topic overlap with this guide.

England � Compliance � Required for all existing tenancies
Renters' Rights Act Information Sheet 2026: What Landlords Must Know
Every landlord in England must serve the government's official Renters' Rights Act Information Sheet on every existing tenant. Penalty for non-compliance: up to �7,000. Here is what it is, who must receive it, and how to serve it correctly.
England � Renters' Rights Act 2025 � Phase 2 � Mandatory Ombudsman � Private Landlord Database
Renters' Rights Act Phase 2: PRS Ombudsman and Private Landlord Database � Landlord Guide 2026
A comprehensive guide to Phase 2 of the Renters' Rights Act 2025: mandatory PRS Ombudsman membership, Private Landlord Database registration, what landlords must prepare now, and how Phase 2 enforcement will work.
England � Compliance � June 2026
Missed the 31 May Renters' Rights Act Information Sheet Deadline � What Landlords Can Do Now
The 31 May 2026 deadline to serve the Renters' Rights Act Information Sheet on existing tenants has passed. This guide explains the legal exposure, whether late service can reduce penalties, and the practical steps to take now.
England � Renters' Rights Act 2025 � Criminal law
Renters' Rights Act 2025 � Criminal Offences and Penalties Every Landlord Must Know
The Renters' Rights Act 2025 creates new criminal offences and raises civil penalties to �40,000. This guide explains which landlord actions are now criminal, how enforcement works, and what to do if you're investigated.
England � Compliance & safety
The Private Landlord Database � mandatory property registration for England landlords
The Renters' Rights Act 2025 creates a mandatory Private Landlord Database (property portal) for England. Every private landlord must register before letting. This guide explains what the database covers, when it launches, what information is required, and how to prepare.
England � Compliance & safety
Awaab's Law 2026 � a practical guide to repair timeframes, hazard logs and enforcement
Awaab's Law introduces mandatory statutory timeframes for repairing damp, mould and other HHSRS hazards in the private rented sector. This guide covers the exact repair periods, what triggers the obligation, how to build a compliant hazard log, and how to avoid council enforcement action.